For MLC :HYGIENE INSPECTION CHECKLIST (form)
Ship’s
name:
|
|
IMO:
|
|
Flag:
|
|
Date:
|
|
ATTENDING
|
|
CHIEF
OFFICER:
|
|
|
|
INSPECTED
|
|
WEEKLY INSPECTIONS
|
|
|
|
|
|
1
|
Accommodation areas
(mess rooms, alleyways, etc.)
|
Week1
|
Week2
|
Week3
|
Week4
|
Week5
|
i.
I
|
Clean and habitable.
|
|
|
|
|
|
ii.
|
Free of any
infestation.
|
|
|
|
|
|
iii.
|
All doors closing properly.
|
|
|
|
|
|
iv.
|
Adequate lighting (as per vessel’s lighting system design) to
facilitate visual task performance and movement of crew.
|
|
|
|
|
|
v.
|
Heating/air conditioning arrangements within acceptable limits.
|
|
|
|
|
|
vi.
|
Condition of
electric cables, no exposed wires, no heavy corrosion.
|
|
|
|
|
|
vii.
|
Nuisance levels
(i.e. noise, dust, odour problems, etc.) within acceptable limits.
|
|
|
|
|
|
viii.
|
Proper operation of ventilation including exhaust fans for sanitary
facilities and lights.
|
|
|
|
|
|
ix.
|
Free from hazards (no damaged flooring/tiling, no slippery, etc).
|
|
|
|
|
|
x.
|
Condition of securing furniture and recreation equipment.
|
|
|
|
|
|
xi.
|
Excessive garbage not being retained on board.
|
|
|
|
|
|
xii.
|
No ship’s stores or equipment stored in crew spaces.
|
|
|
|
|
|
1a
|
Hospital
|
|
|
|
|
|
i.
I
|
All elements of item 1 (as applicable) are satisfied.
|
|
|
|
|
|
ii.
|
Hospital not being used as crew accommodation.
|
|
|
|
|
|
iii.
|
Medical locker properly stocked and with instructions regarding use of
medicines/equipment.
|
|
|
|
|
|
iv.
|
Resuscitator’s
oxygen cylinder and disposable parts (if available) in good
condition/replaced in time.
|
|
|
|
|
|
v.
|
Check
inventory of medicines. Check records of disposable
medicines.
|
|
|
|
|
|
vi.
|
Check
Toilet/Shower, flush the water in the toilet bowl and shower observe color.
|
|
|
|
|
|
vii.
|
Medicine
Chest issue date:
|
|
||||
1b
|
Stairways /
Passageways
|
|
|
|
|
|
i.
I
|
All elements of item 1 (as applicable) are satisfied.
|
|
|
|
|
|
ii.
|
No objects are left
lying blocking stairways and passageways.
|
|
|
|
|
|
1c
|
Toilets/showers/washrooms/
bathrooms
|
|
|
|
|
|
i.
I
|
All elements of item 1 (as applicable) are satisfied.
|
|
|
|
|
|
ii.
|
In working order.
|
|
|
|
|
|
iii.
|
Supplied with hot
water.
|
|
|
|
|
|
iv.
|
No leakages. No blocked drains, broken floor tiles.
|
|
|
|
|
|
v.
|
No defective/broken/missing fittings.
|
|
|
|
|
|
1d
|
Galley / Pantry /
Food preparation areas
|
Week1
|
Week2
|
Week3
|
Week4
|
Week5
|
i.
I
|
All elements of item 1 (as applicable) are satisfied.
|
|
|
|
|
|
ii.
|
Free of any
infestation. Galley equipment clean. Floor tiles clean/unbroken.
|
|
|
|
|
|
iii.
|
No blocked drains.
|
|
|
|
|
|
iv.
|
Hot water supply.
|
|
|
|
|
|
v.
|
Fresh water bunkering/fitting pipe has closing device and separate
filling hose provided.
|
|
|
|
|
|
vi.
|
No signs of pests and vermin.
|
|
|
|
|
|
vii.
|
Inspect hygienic
conditions of food preparation and processing.
|
|
|
|
|
|
viii.
|
Food properly cooked and reheated.
|
|
|
|
|
|
ix.
|
No stores/provisions or equipment stored in inappropriate places.
|
|
|
|
|
|
x.
|
Adequate food supplies and potable water for intended voyage.
|
|
|
|
|
|
xi.
|
Personnel handling food and preparing meals wear clean & proper
clothing.
|
|
|
|
|
|
xii.
|
All food preparation equipment, utensils and surfaces (e.g. pots,
pans, cutting boards, slicers, worktable tops, etc.) and food storage
containers properly handed, sanitized and stored.
|
|
|
|
|
|
xiii.
|
Available inventory of all provisions and catering stores.
|
|
|
|
|
|
xiv.
|
All working and eating surfaces cleaned, galley
floors and scuppers disinfected. Extraction hoods, filters, trunks and
screens free from condensed grease and fats. Grease traps in place and clean.
Ventilation fans in good condition.
|
|
|
|
|
|
xv.
|
Hand sanitizers and a chemical hand sanitizing
solutions used as hand dip available in galley area.
|
|
|
|
|
|
xvi.
|
Pesticides and other toxic substances not available
in galley (properly labelled and stored in appropriate places).
|
|
|
|
|
|
xvii.
|
Fire blanket and other relevant fire extinguishing
means available.
|
|
|
|
|
|
xviii.
|
Domestic catering machinery in operable condition
without defects.
|
|
|
|
|
|
1e
|
Refrigerator rooms
/ freezers
|
Week1
|
Week2
|
Week3
|
Week4
|
Week5
|
i.
I
|
Clean, tidy with
adequate shelving, accurate thermometers and defrosted.
|
|
|
|
|
|
ii.
|
Test alarm.
|
|
|
|
|
|
iii.
|
Check closing,
locking and releasing arrangements (doors opening arrangements from the
inside).
|
|
|
|
|
|
iv.
|
No leakages of Freon.
|
|
|
|
|
|
v.
|
Cooked or ready to eat foods and raw food (seafoods, etc.) stored in
separate sections of refrigerator.
|
|
|
|
|
|
vi.
|
Bagged or carton packed meat and fish properly stowed to permit a free
flow of cold air and to prevent the risk of accidents to people
|
|
|
|
|
|
vii.
|
Temperature warning systems in
refrigerators and freezers.
|
|
|
|
|
|
viii.
|
|
|
|
|
|
|
ix.
|
All deep freezers
(short storage –up to a month) maintained at or below -18°C.
|
|
|
|
|
|
x.
|
All
refrigerators/fresh provisions maintained at or below +5°C.
|
|
|
|
|
|
xi.
|
No water on the floor.
|
|
|
|
|
|
xii.
|
Drainages are clean.
|
|
|
|
|
|
xiii.
|
Products are safely
& hygienically stored with respect to rotation, segregation, consumption
and spillages.
|
|
|
|
|
|
xiv.
|
Lights (no burned
bulbs)
|
|
|
|
|
|
1f
|
Dry store rooms
|
Week1
|
Week2
|
Week3
|
Week4
|
Week5
|
i.
I
|
All elements of item 1 (as applicable) are satisfied.
|
|
|
|
|
|
ii.
|
Adequate shelving
provided.
|
|
|
|
|
|
iii.
|
No signs of stores
deterioration or pests and vermin.
|
|
|
|
|
|
iv.
|
Doors closing and locking arrangements in order.
|
|
|
|
|
|
v.
|
Dry stores securely stowed.
|
|
|
|
|
|
vi.
|
No signs of damage.
|
|
|
|
|
|
vii.
|
Old supplies stowed in the front of selves.
|
|
|
|
|
|
viii.
|
Flour turned monthly.
|
|
|
|
|
|
ix.
|
Stacked sacks enabling effective air circulation.
|
|
|
|
|
|
x.
|
Products are safely
& hygienically stored with respect to rotation, segregation, consumption
and spillages.
|
|
|
|
|
|
1g
|
Vegetable rooms
|
Week1
|
Week2
|
Week3
|
Week4
|
Week5
|
i.
I
|
All elements of item 1 (as applicable) are satisfied.
|
|
|
|
|
|
ii.
|
Adequate shelving
provided.
|
|
|
|
|
|
iii.
|
Vegetables with no
signs of mildew and rot.
|
|
|
|
|
|
iv.
|
Green and root vegetables stored on racks.
|
|
|
|
|
|
v.
|
No contact with other foodstuffs, cleaning.
|
|
|
|
|
|
vi.
|
Products are safely
& hygienically stored with respect to rotation, segregation, consumption
and spillages.
|
|
|
|
|
|
1h
|
Cabin Spaces (Including Owners, Pilot’s, not in use
cabins)
|
|
|
|
|
|
i.
|
All elements of item 1
(as applicable) are satisfied.
|
|
|
|
|
|
ii.
|
Check the Flushing
Water of toilet.
|
|
|
|
|
|
1i
|
Laundry Spaces
|
|
|
|
|
|
i.
|
Linen and laundry equipment in operable condition without defects.
(Different machinery for Clean & bed Linen – Work Clothes)
|
|
|
|
|
|
ii.
|
Areas clean of fuzz.
|
|
|
|
|
|
iii.
|
Draying means.
|
|
|
|
|
|
iv.
|
Clean bedding,
cutlery, towels, soap, toilet paper provided.
|
|
|
|
|
|
1j
|
Communication Arrangements
|
|
|
|
|
|
i.
|
Crew has access to
public phone
|
|
|
|
|
|
ii.
|
Crew has access to
mail
|
|
|
|
|
|
2
|
Air conditioning system
|
MONTHLY
(write the date)
|
i.
I
|
Inspection of air
intake filters, washing or replacing as necessary (washable filters to be
thoroughly rinsed in a super-chlorinated solution of 50 ppm).
|
|
ii.
|
Inspect and clean
sump drains at coolers (evaporators) ensuring that there is no spillage or
accumulation of stagnant condensate.
|
|
iii.
|
Check equipment used for super-chlorination of air conditioning unit
to be properly marked and not utilised for any other purpose.
|
|
3
|
Paint stores, chemical stores, Oxygen/Acetylene bottles stores,
battery room
|
Week1
|
Week2
|
Week3
|
Week4
|
Week5
|
i.
I
|
Clean and tidy.
|
|
|
|
|
|
ii.
|
Adequate
ventilation, Illumination.
|
|
|
|
|
|
iii.
|
MSDS displayed at appropriate locations.
|
|
|
|
|
|
iv.
|
Containers (drum, can, bottle, pipe, tank, etc) clearly labelled with
the identity of hazardous material they contain and a hazard warning affixed
to it.
|
|
|
|
|
|
v.
|
No cans, buckets are left open, especially those with
flammable/dangerous contents (i.e. thinner, paints, buttery acids)
|
|
|
|
|
|
4
|
Working areas (deck area, engine room, etc.)
|
Week1
|
Week2
|
Week3
|
Week4
|
Week5
|
i.
I
|
Clean and tidy.
|
|
|
|
|
|
ii.
|
Heating/air conditioning arrangements (where applicable) within
acceptable limits.
|
|
|
|
|
|
iii.
|
Adequate lighting (as per vessel’s lighting system design) to
facilitate visual task performance and movement of crew.
|
|
|
|
|
|
iv.
|
Suitable PPE provided, maintained in clean and proper condition
without signs of wear or damage.
|
|
|
|
|
|
v.
|
Engine room vibration in acceptable levels.
|
|
|
|
|
|
vi.
|
Tools placed in appropriate places, benches and not left lying around.
|
|
|
|
|
|
vii.
|
All heavy parts to be securely stowed.
|
|
|
|
|
|
MONTHLY ITEMS
|
Write the date, job
performed
|
||||||||||||
5
|
Galley
|
Jan
|
Feb
|
Mar
|
Apr
|
May
|
Jun
|
July
|
Aug
|
Sept
|
Oct
|
Nov
|
Dec
|
i.
|
General washing
(walls, ceiling, floor, ventilation duct etc.)
|
|
|
|
|
|
|
|
|
|
|
|
|
6
|
Refrigerators / store rooms
|
|
|
|
|
|
|
|
|
|
|
|
|
i.
|
General washing of
stores rooms and refrigerators. (as per item 1i, above)
|
|
|
|
|
|
|
|
|
|
|
|
|
7
|
Air coolers Local
(where applicable)
|
|
|
|
|
|
|
|
|
|
|
|
|
i.
|
Check and cleaning of sump drains from spillage or accumulation of
stagnant condensate.
|
|
|
|
|
|
|
|
|
|
|
|
|
ii.
|
Wash thoroughly with super chlorinated solution of 50 ppm.
|
|
|
|
|
|
|
|
|
|
|
|
|
ANNUAL INSPECTIONS
|
||
8
|
Fresh water tanks
|
DATE
|
i.
|
Opened up, emptied,
ventilated and inspected.
|
|
ii.
|
Inspection is to be
followed by thorough cleaning, re-coating where necessary with epoxy coating
or appropriate special paint, airing, disinfecting and refilling with clean
fresh water chlorinated to a concentration of 0.2 ppm
|
|
iii.
|
UV Sterilizing
Lamp last replacement (follow makers
instructions)
|
|
iv.
|
Clean / renew (where necessary) filters – dolomites.
|
|
v.
|
Distribution system chlorine or bromine analyser and
chart recorder in operational condition, maintained and calibrated.
|
|
RESULT AND DECISION:
|
1
to be immediately dealt with by the
ship’s personnel
|
|
|
|
2
request or suggestion by the Company
|
|
|
|
Chief officer / Signature:
|
|
Master / Signature:
|
|